Ramping Up
The reconstruction of the Sprinfield interchange, also known as the Mixing Bowl�one of the largest, most complex highway projects in the nation�has reached the halfway point. But some...

Under Cover
In capping a 190-acre hazardous landfill in metropolitan Los Angeles, engineers saved time and money by relying on a construction method seldom used in the environmental sector: design/build....

Worthy Successor
Now under construction, the replacement for Florida's Hathaway Bridge, which crosses St. Andrew Bay in Panama City, will more than double the capacity of the existing structure....

The Water Resources Development Act for Restoration of Urban Waterway Superfund Sites
The objective of this paper is to provide information for interested parties to use in their evaluation of WRDA as a potential authority for completion of sediment remediation and restoration...

Monitored Natural Recovery and Dredging Decision Analysis at Bellingham Bay, Washington
The Whatcom Waterway Site, located within inner Bellingham Bay, Washington consists of intertidal and subtidal aquatic lands within and adjacent to the Whatcom Waterway in Bellingham,...

Sediment Remediation at the Unnamed Tributary to the Ottawa River
A sediment removal action was conducted in the Unnamed Tributary to the Ottawa River to address sediments containing polychlorinated biphenyls(PCBs) at concentrations up to 74,000 mg/kg....

Application of the NRC Framework for Evaluation of Remedial Actions at a PCB Contaminated Sediment Site
The National Research Council recently proposed that the framework of the Presidents/Congressional Commission on Risk Assessment and Risk Management be applied to the selection and implementation...

Measuring Productivity: An Industry Challenge
Is the design and construction industry more productive today than it was a decade ago? Is it matching the achievements in productivity attained by other industries? Are technological...

Transformation
The site of a former wastewater treatment plant in western New York State is now home to a sprawling public works complex thanks to an inventive reuse scheme that consolidates public works...

Failures and Problems with Lift-Slab Construction
This chapter provides an overview of failures and problems with lift-slab construction. Topics include jack systems with inadequate take-up devices; the Canadian wedge connection; Serra...

Lifting Collars and Lifting Equipment
The terms lifting collars and shear heads are used interchangeably in the industry. In this book the term lifting collar is used since it is a unique term applicable to lift-slab construction...

Stability and Loads
This chapter examines stability and loads. Topics include stability and lateral load resistance during construction; effective lengths of cantilever columns; effect on stability of frame...

Initial Considerations
The purpose of this section is to aid the line designers in developing their specifications for fiber-reinforced polymer (FRP) materials utilized in electric overhead line structures....

Materials and Manufacturing Processes
This chapter introduces the basic materials used in the manufacturing of composite structures. It will help the line designer in understanding how the different elements of the fiber-matrix...

Performance-Based Criteria for FRP Products and Materials
In most ways, fiber-reinforced polymer (FRP) structures perform similar to wood and steel structures. There are, however, certain differences and these differences are described in this...

Superior Court
For a sport obsessed with getting a round ball through a hoop, the shape of the new Naismith Memorial Basketball Hall of Fame seems entirely appropriate. The building is intersected by...

Evaluation of the Tricon Retained Soil Wall System
Prepared by the Highway Innovative Technology Evaluation Center, a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed to...

Evaluation of the Maccaferri Terramesh System Retaining Wall
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...

Crossing the Yangtze
The Nanjing Second Yangtze River Bridge, which links two parts of the city of Nanjing, features the first use of an epoxy asphalt deck pavement in China and one of the longest cable-stayed...

A Dam for a Dam
The General Electric (GE) Dam in Minneapolis, Minnesota, was more than a century old when it began leaking excessively in December 1998. Operations staff for the dam owner�the Minneapolis-based...

 

 

 

 

Return to search